Racking Installation & Reconfiguration
Certified crews install, expand or reconfigure racking with minimal downtime.
- Coverage
- Nationwide
- Crew Size
- 2–8 techs
- Typical Duration
- 3–10 days
What's included
Certified installation crews bring your racking layout to life on schedule — and reconfigure it as your operation changes, with minimal disruption to live picking.
Any change to bay width, beam level or upright height changes the rated load — reconfigured racking is always re-certified before it's returned to service.
Process
Site survey and floor-loading check, layout drawing sign-off, delivery and staged installation, final inspection and handover pack.